Assignment | Due date | Read | Turn in. |
---|---|---|---|
I | Tu. 1/29 | IVA I.5 #1, 3-9 IVA I.1 #1-5 IVA I.2 #1-9, 13-15 |
HW 1. |
II | Th 2/7 | IVA I.3 #1-6 IVA I.4 #1-12 | HW 2. |
III | Tu 2/19 | IVA II.1 #1-3 IVA II.2 #1-7, 10-12 | IVA I.3 #4, 5, 6 IVA I.4 #5, 9b, 11 or 12 IVA II.1 #1d, 2b, 3bc |
IV | Th. 2/28 | IVA II.3 #5, 6-9 IVA II.4 #9, 11, 12 | HW 4. |
V | Tu 3/12 | IVA II.9 #2,3 IVA II.5 #3, 7, 8, 13-18 IVA II.6 #10-12 IVA II.7 #2, 3, 6, 7, 9 | HW 5. |
VI | Th 3/21 | IVA II.9 #2,3 IVA III.5 #2,3, 6-16 IVA III.6 #1-5, 8-13 |
HW 6. |
VII | Th 4/25 | IVA IV.2 #1,2,4,6,8-10, 14, 15 IVA IV.3 #2-5, 6, 7, 9, 10-12 IVA IV.4 #2-6, 8-10 |
IVA IV.3 #9 IVA IV.4 #3, 4, 8 IVA IV.5 #3, 4 |